Analysis of Boeing Manufacturing Case

Boeing adopted the novel change method for designing and developing the 787 Dreamliner as a end result of they had been in competitors with Airbus and needed a model new method in which they could use innovation to face out upon their competitiors. Boeing was seeking to scale back manufacturing costs and growth times. Boeing took an aggressive method to apply their methods. There was not enough time to totally establish the project or to even talk with vendors. The project was delayed primarily because of their world supply chain community.

Don’t waste time Get a verified expert to help you with Essay


Boeing didn’t have the necessary expertise to fulfill the needs of the 787 Dreamliner which unfortunately caused it to have many delays and issues. In my opinion, this was not a very good choice. It was a financial burden to the corporate and caused unnecessary stress on the company as an entire. They were left with no alternative but to make up for the losses to airways that bought the 787 Dreamliner.

When analyzing the Dreamliner program using the silo perspective, we are in a position to see that this system had difficulty communicating between Boeing and its distributors.

However, the silo perspective was good for individual departments throughout the company. It elevated effectivity within these departments, however created processes of supply chains to turn into incompatible.

The plan at Boeing was to make use of varied suppliers during which would each have experience over the totally different elements of the airplane to quicken the method, when it reality it delayed it extraordinarily. When looking on the enterprise persceptive, Boeing needed IS to watch the connection with their vendors, resolving issues in a shorter timeframe.

The design of the built-in provide chain lacked a management system that was in a place to monitor the designing, planning, and manufacturing, in addition to the suppliers. There was too many distributors within the provide chain, which finally brought on it to fail. To combine the provision chain higher, Boeing needed to have a full understanding of supply chain management and monitor it closely utilizing IS. Supply chain management is the circulate of products. Boeing may have been tracking the movement and storage of the parts of the planes.

They also could have been tracking what their vendors were doing and when by having them report down specific occasions and dates that they had been engaged on the parts. Lastly, they would have been capable of hold monitor of the general time it took to make each part. With this data they might have been able to find more efficient methods to build the components. All of these could be carried out through IS and would have triggered the Dreamliner from failing.

If I have been the program manager, I would have seemed to determine a producing manufacturing facility that centered solely on manufacturing of the parts for the plane. This method, extra attention would be paid to the particular parts and communication between the distributors would have been more practical. This factory would wish staff which would be expert in their specific operate and that would have the power to produce the parts in a timely and efficient method. Enforcing more tips will make certain that the vendors are able to get their jobs carried out. It is also necessary to plan for the future, as a outcome of the Dreamliner held high expectations it was in excessive demand. Boeing should have predicted an increase in orders and better ready themselves for what was about to return their way. An IS would have helped to track knowledge that would have been helpful in figuring out the projection of the Dreamliner.